Find out the time required to complete the following project and the critical activities:....

Under : ARTS    Posted On :  23.06.2018 11:06 pm

The time taken by an activity in a project network follows a distribution with a standard deviation of one sixth of the range, approximately.....

Under : ARTS    Posted On :  23.06.2018 11:01 pm

Programme Evaluation and Review Technique (PERT) is a tool that would help a project manager in project planning and control.....

Under : ARTS    Posted On :  23.06.2018 10:50 pm

Determine the critical path, the critical activities and the project completion time.....

Under : ARTS    Posted On :  23.06.2018 10:38 pm

The critical path method (CPM) aims at the determination of the time to complete a project and the important activities on which a manager shall focus....

Under : ARTS    Posted On :  23.06.2018 09:43 am

Construct the network diagram for a project with the following activities:....

Under : ARTS    Posted On :  23.06.2018 09:31 am

Certain key concepts pertaining to a project network are described below: ....

Under : ARTS    Posted On :  23.06.2018 09:26 am

Determine the minimum spanning tree for the following network.....

Under : ARTS    Posted On :  23.06.2018 09:09 am

Tree: A minimally connected network is called a tree. If there are n nodes in a network, it will be a tree if the number of edges = n-1.....

Under : ARTS    Posted On :  23.06.2018 08:47 am

Looking at the diagram, we see that node 1 is the origin and the nodes 2 and 3 are neighbours to the origin. Among the two nodes, we see that node 2 i....

Under : ARTS    Posted On :  23.06.2018 08:36 am

Imagine a salesman or a milk vendor or a post man who has to cover certain previously earmarked places to perform his daily routines.....

Under : ARTS    Posted On :  23.06.2018 08:06 am

Finding the EOQ with shortages and the replenishment of inventory is at a finite rate....

Under : ARTS    Posted On :  23.06.2018 07:56 am

E.B.Q with known demand, shortages is permitted and replenishment of inventory is instantaneous....

Under : ARTS    Posted On :  23.06.2018 06:10 am

Determination of the optimum batch quantity [EBQ] if the demand is known and uniform with a finite rate of replenishment....

Under : ARTS    Posted On :  23.06.2018 05:59 am

As we have already classified the economic order quantity or economic batch size problems into two types, based on the demand position. ....

Under : ARTS    Posted On :  23.06.2018 05:35 am

In this section, let us gain some idea about various costs and terminology associated with Inventory Management.....

Under : ARTS    Posted On :  23.06.2018 05:29 am

Based on the reasons, for which the inventory is accumulated, it can be classified into the following categories.....

Under : ARTS    Posted On :  23.06.2018 05:25 am

Any firm would like to hold inventory at specific level to meet smooth, uninterrupted production schedule or to cater consumer demand in case of whole....